Баяутский район
JOB RESPONSIBILITIES
1.1. Preparation of construction production at the construction site:
- organization of incoming control of design documentation for capital construction projects;
- registration of permits and permits necessary for construction work at the construction site;
- planning and monitoring the preparation and equipment of the construction site;
- planning of construction production at the construction site in accordance with the requirements of labor protection, fire safety and environmental protection;
- monitoring the implementation of training activities at the construction site and compliance by workers with labor protection, fire safety and environmental protection requirements;
- planning and control of the preparation of production areas, work sites and workplaces for conducting a special assessment of working conditions.
1.2. Logistics support for construction production at the construction site:
- determination of the needs of construction production at the construction site for material and technical resources;
- consolidated supply planning and control of the distribution, storage and consumption of material and technical resources at the construction site (capital construction projects and individual work areas);
- determination of the list of construction equipment, machines and mechanisms required for construction production;
- consolidated planning for the supply, operation, maintenance and repair of construction equipment, machinery and mechanisms at the construction site (capital construction projects and individual work areas);
- determination of the needs of construction production for resources supplied through external engineering networks (water, electricity, heat);
- consolidated supply planning and control of the distribution and consumption of resources supplied through external engineering networks to the construction site (capital construction site and individual work areas);
- incoming control of the quality and volumes (quantity) of supplied material and technical resources, construction equipment, machinery and mechanisms, resources supplied through external engineering networks;
- control over the expenditure of funds on material and technical support of construction production.
1.3. Operational management of construction production at the construction site:
- operational planning, coordination, organization and conduct of construction control during construction, reconstruction, major repairs of capital construction projects;
- coordination of construction processes at the construction site;
- development, planning and control of the implementation of operational measures aimed at correcting defects in the results of construction work at the construction site;
- maintaining current and as-built documentation on the production activities of the construction site.
1.4. Acceptance and quality control of the results of completed types and stages of construction work at the construction site:
- planning and control of work and construction control activities;
- development, planning and monitoring of the implementation of measures aimed at preventing and eliminating the causes of deviations in the results of completed construction work from the requirements of regulatory technical, technological and design documentation;
- acceptance of completed types and individual stages of work on construction, reconstruction, major repairs of capital construction projects, elements, structures and parts of capital construction projects, engineering and technical support networks, their sections with the right to sign the relevant documents;
- maintaining established reporting on completed types and stages of construction work;
- implementation and improvement of the quality management system for construction production.
1.5. Acceptance of construction work results to the Contractor:
- planning and monitoring the implementation of work and activities to prepare the results of construction work for delivery to the customer (completed capital construction projects, stages (complexes) of work, conservation of unfinished capital construction projects);
- preparation of as-built technical documentation to be submitted to acceptance committees;
- presentation of the results of construction work to the acceptance committees;
- signing an acceptance certificate for a capital construction project;
- signing a document confirming the compliance of the constructed or reconstructed capital construction facility with the requirements of technical regulations;
- signing a document confirming the compliance of the parameters of the constructed or reconstructed capital construction facility with the design documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used;
- signing a document confirming the compliance of the constructed or reconstructed capital construction facility with the technical conditions for connection (technological connection) to engineering support networks (if any).
1.6. Implementation of a quality management system at the construction site:
- planning and monitoring the implementation of work and activities for the implementation of a quality management system for construction production;
- analysis and assessment of the effectiveness of the implementation of the quality management system for construction production;
- optimization of construction production based on the requirements and recommendations of the quality management system.
1.7. Development of measures to improve the efficiency of production and economic activities at the construction site:
- determination of the main reserves of construction production, planning and monitoring the implementation of measures to increase the efficiency of production and economic activities and labor productivity at the construction site;
- planning and monitoring the implementation of work and measures for the introduction of new construction production technologies, ensuring increased efficiency of production and economic activities at the construction site;
- assessment of the results of work and activities aimed at increasing the efficiency of production and economic activities at the construction site.
1.8. Management of construction site workers:
- determining the need for construction production at the construction site in labor resources;
- placement of workers at the construction site (capital construction projects and individual work areas);
- monitoring the implementation and operational management of the performance by the heads of work production areas of their functional (job) responsibilities.
PROBUILD GENERATION
Ташкент
до 40000000 UZS
Antal International Tashkent Xususiy Bandlik Agentligi
Ташкент
до 40000000 UZS
Antal International Tashkent Xususiy Bandlik Agentligi
Ташкент
до 40000000 UZS
Ташкент
до 40000000 UZS
AdvantiX group
Ташкент
до 40000000 UZS
Antal International Tashkent Xususiy Bandlik Agentligi
Ташкент
до 40000000 UZS
Ташкент
от 20000000 UZS
Ташкент
до 14000000 UZS
НОУ Thompson Drujba
Ташкент
до 14000000 UZS
Ташкент
до 14000000 UZS